The ripple effects of the May 28th flooding are still being felt. The disaster has forced the city to have study done of the storm drainage system in the areas affected by the flooding, a study which Engineering Manager Pat Mauro hopes can be expanded in the near future. The cost of the study is expected to run about 300 thousand dollars.